ASSEMBLY & OPERATION MANUAL1 1 0 / 2 2 0C E L L A R nuvok o o l s pac eTM
~ 10 ~~ 11 ~3Insert LIGHT COVER to holes pre drilled on front edge of TOP panel. STEP 6 : LIGHT AND LIGHT COVER INSTALLATION1Plug cord to LIGHT
~ 10 ~~ 11 ~Install TOP HINGE with HEX BOLTS (B)NOTE : Adjust nal position of the door before tightening the bolts and move cellar into p
~ 13 ~FEATURES: - Default SET temperature 57º F/14º C (ideal for wine storage). - Calibration option of the temperature sensor. - Display of a
~ 13 ~MAXIMUM CAPACITIES AND LOADING TIPSMaximum capacities and sample loading arrangements for Vintage Keeper Tuscany wine cellars are illustrated be
TROUBLE SHOOTING GUIDEAlthough each Vintage Keeper cooling unit has been carefully tested at every stage of manufacture, occasional problems arise, th
LIMITED WARRANTY AND PRODUCT SUPPORTONE YEAR LIMITED WARRANTYIf your Koolspace cooling unit or cabinet fails to perform as designed within one year of
Toll free: 1-888-274-8813www.koolspace.com1 1 0 / 2 2 0C E L L A R nuvok o o l s pac eTM
~ 2 ~~ 3 ~1. LOCATING YOUR WINE CELLAR - Remember, it is not an appliance, it is a piece of furniture2. AREA FOR ASSEMBLING YOUR WINE CELLAR Choose
~ 2 ~~ 3 ~HARDWARE KITCBAFEGDH*NOTE : Hardware quantities for Model 220 are indicated in parenthesis.Cam Capx 20 (x24)*Hex Boltx 14 Hex Wrenchx 1Camx
~ 4 ~~ 5 ~STEP 1 : PANEL PREPARATION1PANEL EDGEHCAUTION :1. Watch for sharp staples on boxes.2. DO NOT STEP ON PANELS3. The manual will give a recomme
~ 4 ~~ 5 ~STEP 2 : CABINET ASSEMBLYAttach Top and Bottom to Back by CAREFULLY aligning edge holes over Cam Pins and gently push together to avoid dama
~ 6 ~~ 7 ~STEP 2 : CABINET ASSEMBLY CONTINUEDCHECK PANEL ORIENTATION !!!Open Box VP5 or VP2. Insert Cam Pins (E) into SIDE PANEL’S predrilled holes bo
~ 6 ~~ 7 ~Fasten BASE with HEX BOLTS (B)4CABINET BOTTOM FRONT BASE 134STEP 3 : HINGE,BASE AND LEGS INSTALLATIONRaise cabinet and check for pot
~ 8 ~~ 9 ~211CABINET BOTTOM STEP 4 : SHELVESBOTTOMTOPPRESSOpen box VP4 Hook SHELVES into hangers starting from the bottom of cabinetHINT :
~ 8 ~~ 9 ~LEVEL TO OPENINGSTEP 5 : COOLING UNIT INSTALLATIONGET HELP BEFORE INSTALLING AND KEEP CHILDREN CLEAR OF CELLAR CONSTRUCTION AREA. Get helpe
Comments to this Manuals